Medium priority
BBS

Bezer Basic School

public schoolBamboo P.O, St. Ann
Planned
0%

Hurricane Recovery and Infrastructure Repair

Zinc sheets blown off, Ceiling collapsed, Books and Charts destroyed.

Updated Nov 26, 2025

Project Items Needed

All materials and supplies required for this project

Funded
Partial
Open

Project Summary

$0 JMD raised of $0 JMD0% Funded9 items needed

Items Breakdown

Prices will be shown when suppliers are available

Zinc Sheet - 20 ft Galvanized

No supplier available
Material
$0 JMDper sheet
25 sheets remaining
0 funded25 total

Zinc Sheet - 16 ft Galvanized

No supplier available
Material
$0 JMDper sheet
6 sheets remaining
0 funded6 total

Roofing Screws w/ Washers - 2.5 in

No supplier available
Material
$0 JMDper box
200 boxs remaining
0 funded200 total

Concrete Screw - 1/4 x 2 in

No supplier available
Material
$0 JMDper box
100 boxs remaining
0 funded100 total

Sheet Rock (Drywall)

No supplier available
Material
$0 JMDper sheet
40 sheets remaining
0 funded40 total

1x3x16 ft Rough Untreated Lumber

No supplier available
Material
$0 JMDper length
32 lengths remaining
0 funded32 total

1x3x14 ft Rough Untreated Lumber

No supplier available
Material
$0 JMDper length
4 lengths remaining
0 funded4 total

2x6x20 ft Framing Lumber

No supplier available
Material
$0 JMDper board
15 boards remaining
0 funded15 total

Books and Charts

No supplier available
Material
$0 JMDper unit
1 unit remaining
0 funded1 total

We are awaiting quotes for some items.

Coordinators

People managing this project

S
Shawn McleanProject Coordinator
Project details
Status
planned
Category
relief
Priority
Medium priority
Tags
hurricanereliefinfrastructure
Coordinator notes
Board Member: Tavon Bryan. Moderate damage - zinc sheets blown off, ceiling collapsed, books and charts destroyed.