Zinc sheets blown off, Ceiling collapsed, Books and Charts destroyed.
BBS
Bezer Basic School
public school•Bamboo P.O, St. Ann
Planned
0%
Hurricane Recovery and Infrastructure Repair
Created Nov 26, 2025
What's Needed
Materials
Zinc Sheet - 20 ft Galvanized
25 of 25 sheets remaining
Zinc Sheet - 16 ft Galvanized
6 of 6 sheets remaining
Roofing Screws w/ Washers - 2.5 in
200 of 200 boxs remaining
Concrete Screw - 1/4 x 2 in
100 of 100 boxs remaining
Sheet Rock (Drywall)
40 of 40 sheets remaining
1x3x16 ft Rough Untreated Lumber
32 of 32 lengths remaining
1x3x14 ft Rough Untreated Lumber
4 of 4 lengths remaining
2x6x20 ft Framing Lumber
15 of 15 boards remaining
Books and Charts
1 of 1 item remaining
Project details
- Status
- planned
- Category
- relief
- Priority
- Medium priority
- Tags
- hurricanereliefinfrastructure
- Coordinator notes
- Board Member: Tavon Bryan. Moderate damage - zinc sheets blown off, ceiling collapsed, books and charts destroyed.