BBS
Bezer Basic School
public school•Bamboo P.O, St. Ann
Planned
0%
Hurricane Recovery and Infrastructure Repair
Zinc sheets blown off, Ceiling collapsed, Books and Charts destroyed.
Updated Nov 26, 2025
Project Items Needed
All materials and supplies required for this project
Funded
Partial
Open
Project Summary
$0 JMD raised of $0 JMD•0% Funded•9 items needed
Items Breakdown
Prices will be shown when suppliers are available
Zinc Sheet - 20 ft Galvanized
No supplier available•
Material
$0 JMDper sheet
25 sheets remaining
0 funded25 total
Zinc Sheet - 16 ft Galvanized
No supplier available•
Material
$0 JMDper sheet
6 sheets remaining
0 funded6 total
Roofing Screws w/ Washers - 2.5 in
No supplier available•
Material
$0 JMDper box
200 boxs remaining
0 funded200 total
Concrete Screw - 1/4 x 2 in
No supplier available•
Material
$0 JMDper box
100 boxs remaining
0 funded100 total
Sheet Rock (Drywall)
No supplier available•
Material
$0 JMDper sheet
40 sheets remaining
0 funded40 total
1x3x16 ft Rough Untreated Lumber
No supplier available•
Material
$0 JMDper length
32 lengths remaining
0 funded32 total
1x3x14 ft Rough Untreated Lumber
No supplier available•
Material
$0 JMDper length
4 lengths remaining
0 funded4 total
2x6x20 ft Framing Lumber
No supplier available•
Material
$0 JMDper board
15 boards remaining
0 funded15 total
Books and Charts
No supplier available•
Material
$0 JMDper unit
1 unit remaining
0 funded1 total
We are awaiting quotes for some items.
Project details
- Status
- planned
- Category
- relief
- Priority
- Medium priority
- Tags
- hurricanereliefinfrastructure
- Coordinator notes
- Board Member: Tavon Bryan. Moderate damage - zinc sheets blown off, ceiling collapsed, books and charts destroyed.