CP
Cove Primary
public school•Cousins Cove, Hanover
Planned
0%
Hurricane Recovery and Infrastructure Repair
1. Roof completely caved in 2. Damaged furniture and equipment 3. Electrical wires damaged 4. Loss of teaching resources and supplies 5. Damaged solar source
Updated Nov 24, 2025
Project Items Needed
All materials and supplies required for this project
Funded
Partial
Open
Project Summary
$0 JMD raised of $0 JMD•0% Funded•27 items needed
Items Breakdown
Prices will be shown when suppliers are available
Air Conditioning Unit
No supplier available•
Material
$0 JMDper unit
30 units remaining
0 funded30 total
Corrugated Zinc Sheet - 12 ft (28 gauge)
No supplier available•
Material
$0 JMDper sheet
100 sheets remaining
0 funded100 total
Zinc Roof Sheet
No supplier available•
Material
$0 JMDper sheet
150 sheets remaining
0 funded150 total
Zinc Roof Sheet - Maintenance
No supplier available•
Material
$0 JMDper sheet
100 sheets remaining
0 funded100 total
Industrial Roof Sheeting (Square)
No supplier available•
Material
$0 JMDper square
150 squares remaining
0 funded150 total
Zinc Ridge Cap - 12 ft
No supplier available•
Material
$0 JMDper length
100 lengths remaining
0 funded100 total
Roof Sealant
No supplier available•
Material
$0 JMDper unit
40 units remaining
0 funded40 total
Roofing Screws w/ Washers - 2.5 in
No supplier available•
Material
$0 JMDper box
200 boxs remaining
0 funded200 total
Roofing Screws
No supplier available•
Material
$0 JMDper box
200 boxs remaining
0 funded200 total
Galvanized Roofing Nails - 2.5 in
No supplier available•
Material
$0 JMDper box
150 boxs remaining
0 funded150 total
Hurricane Strap Nails - 3 in
No supplier available•
Material
$0 JMDper box
150 boxs remaining
0 funded150 total
Plyboard Sheet
No supplier available•
Material
$0 JMDper sheet
250 sheets remaining
0 funded250 total
3/4 in Plywood - 4x8 ft
No supplier available•
Material
$0 JMDper sheet
260 sheets remaining
0 funded260 total
2x2x12 ft Treated Lumber
No supplier available•
Material
$0 JMDper board
200 boards remaining
0 funded200 total
1x4x12 ft Purlin Board
No supplier available•
Material
$0 JMDper board
150 boards remaining
0 funded150 total
2x4x12 ft Framing Lumber
No supplier available•
Material
$0 JMDper board
251 boards remaining
0 funded251 total
2x6x12 ft Framing Lumber
No supplier available•
Material
$0 JMDper board
251 boards remaining
0 funded251 total
Door Trim Adhesive Protection
No supplier available•
Material
$0 JMDper unit
251 units remaining
0 funded251 total
Exterior Door - 36x80
No supplier available•
Material
$0 JMDper door
30 doors remaining
0 funded30 total
25 ft Measuring Tape
No supplier available•
Material
$0 JMDper tool
20 tools remaining
0 funded20 total
Building Blocks
No supplier available•
Material
$0 JMDper unit
60 units remaining
0 funded60 total
Crayola Play Dough
No supplier available•
Material
$0 JMDper unit
61 units remaining
0 funded61 total
Fat Pencil
No supplier available•
Material
$0 JMDper unit
50 units remaining
0 funded50 total
Pencils pack of 12
No supplier available•
Material
$0 JMDper pack
150 packs remaining
0 funded150 total
Exercise Book Small Fine line
No supplier available•
Material
$0 JMDper book
200 books remaining
0 funded200 total
Exercise Book Big
No supplier available•
Material
$0 JMDper book
200 books remaining
0 funded200 total
Double Line Book
No supplier available•
Material
$0 JMDper book
200 books remaining
0 funded200 total
We are awaiting quotes for some items.
Project details
- Status
- planned
- Category
- relief
- Priority
- Critical priority
- Tags
- hurricanereliefinfrastructure
- Coordinator notes
- Combined from multiple submissions. Principal: Patrice Campbell. Critical infrastructure damage requiring immediate attention.