WhatsApp Image 2025-11-27 at 2.54.37 PM (3).jpeg
WhatsApp Image 2025-11-28 at 11.17.51 AM.jpeg
WhatsApp Image 2025-11-27 at 2.57.11 PM (4).jpeg
WhatsApp Image 2025-11-27 at 2.54.37 PM (2).jpeg
WhatsApp Image 2025-11-27 at 2.57.11 PM (5).jpeg
WhatsApp Image 2025-11-27 at 2.57.11 PM.jpeg
WhatsApp Image 2025-11-27 at 2.54.37 PM (4).jpeg
WhatsApp Image 2025-11-27 at 2.57.11 PM (1).jpeg
WhatsApp Image 2025-11-27 at 2.57.11 PM (2).jpeg
WhatsApp Image 2025-11-27 at 2.57.11 PM (3).jpeg
WhatsApp Image 2025-11-27 at 2.57.10 PM.jpeg
WhatsApp Image 2025-11-28 at 11.25.44 AM.jpeg
WhatsApp Image 2025-11-28 at 11.22.36 AM.jpeg
WhatsApp Image 2025-11-28 at 11.22.36 AM (1).jpeg
WhatsApp Image 2025-11-28 at 11.22.35 AM.jpeg
WhatsApp Image 2025-11-28 at 11.22.30 AM (1).jpeg
WhatsApp Image 2025-11-28 at 11.21.28 AM.jpeg
WhatsApp Image 2025-11-28 at 11.22.32 AM.jpeg
1 / 18
Critical priority
APA

Alderton Primary and Infant School

public schoolClaremont, St. Ann
Planned
0%

Block A Roof Restoration

Restore the roof of Block A, the main administrative block. The roof has been completely stripped off leaving the office, tuck-shop, staffroom and bathroom exposed to the elements. This has resulted in molds, water marks, and water-soaked walls and furniture. Important documents, files, books, furniture and appliances have been destroyed. All electrical systems have been compromised.

Updated Nov 28, 2025

Project Items Needed

All materials and supplies required for this project

Funded
Partial
Open

Project Summary

$0 JMD raised of $0 JMD0% Funded9 items needed

Items Breakdown

Prices will be shown when suppliers are available

Industrial Roof Sheeting (Square) - 15 sheets

No supplier available
Material
$0 JMDper square
15 squares remaining
0 funded15 total

Roof Sealant

No supplier available
Material
$0 JMDper unit
1 unit remaining
0 funded1 total

Roofing Screws w/ Washers - 2.5 in - 9 boxes

No supplier available
Material
$0 JMDper box
9 boxs remaining
0 funded9 total

2x2x12 ft Treated Lumber - 10 pieces

No supplier available
Material
$0 JMDper board
10 boards remaining
0 funded10 total

2x4x12 ft Framing Lumber - 12 pieces

No supplier available
Material
$0 JMDper board
12 boards remaining
0 funded12 total

2x6x12 ft Framing Lumber - 12 pieces

No supplier available
Material
$0 JMDper board
12 boards remaining
0 funded12 total

1x6x16 ft Dressed Treated Lumber - 12 pieces

No supplier available
Material
$0 JMDper length
12 lengths remaining
0 funded12 total

Plyboard Sheet - 15 sheets

No supplier available
Material
$0 JMDper sheet
15 sheets remaining
0 funded15 total

Heavy-Duty Tarpaulin - 6 pieces

No supplier available
Material
$0 JMDper tarp
6 tarps remaining
0 funded6 total

We are awaiting quotes for some items.

Part of project group

Alderton Primary and Infant School Hurricane Recovery

Hurricane Melissa recovery project to restore school facilities. Block A (main administrative block) has lost its roof completely, leaving office, tuck-shop, staffroom and bathroom exposed. Block C has also suffered minor damages with parts of the roof compromised. All electrical systems have been compromised, and flooding occurs in corridors when it rains.

Coordinators

People managing this project

S
Shawn McleanProject Coordinator
Project details
Status
planned
Category
relief
Priority
Critical priority
Tags
hurricane-recoveryroof-repairschool-facilities
Coordinator notes
Block A is the main administrative block. Complete roof restoration needed urgently.