WhatsApp Image 2025-11-27 at 2.57.10 PM.jpeg
WhatsApp Image 2025-11-28 at 11.25.44 AM.jpeg
WhatsApp Image 2025-11-28 at 11.22.36 AM.jpeg
WhatsApp Image 2025-11-28 at 11.22.36 AM (1).jpeg
WhatsApp Image 2025-11-28 at 11.22.35 AM.jpeg
WhatsApp Image 2025-11-28 at 11.22.30 AM (1).jpeg
WhatsApp Image 2025-11-28 at 11.21.28 AM.jpeg
WhatsApp Image 2025-11-28 at 11.22.32 AM.jpeg
1 / 18
Critical priority
APA

Alderton Primary and Infant School

public schoolClaremont, St. Ann
Planned
0%

Block A Roof Restoration

Created Nov 28, 2025

Restore the roof of Block A, the main administrative block. The roof has been completely stripped off leaving the office, tuck-shop, staffroom and bathroom exposed to the elements. This has resulted in molds, water marks, and water-soaked walls and furniture. Important documents, files, books, furniture and appliances have been destroyed. All electrical systems have been compromised.

What's Needed

Materials

Industrial Roof Sheeting (Square) - 15 sheets
15 of 15 squares remaining
Roof Sealant
1 of 1 item remaining
Roofing Screws w/ Washers - 2.5 in - 9 boxes
9 of 9 boxs remaining
2x2x12 ft Treated Lumber - 10 pieces
10 of 10 boards remaining
2x4x12 ft Framing Lumber - 12 pieces
12 of 12 boards remaining
2x6x12 ft Framing Lumber - 12 pieces
12 of 12 boards remaining
1x6x16 ft Dressed Treated Lumber - 12 pieces
12 of 12 lengths remaining
Plyboard Sheet - 15 sheets
15 of 15 sheets remaining
Heavy-Duty Tarpaulin - 6 pieces
6 of 6 tarps remaining

Part of project group

Alderton Primary and Infant School Hurricane Recovery

Hurricane Melissa recovery project to restore school facilities. Block A (main administrative block) has lost its roof completely, leaving office, tuck-shop, staffroom and bathroom exposed. Block C has also suffered minor damages with parts of the roof compromised. All electrical systems have been compromised, and flooding occurs in corridors when it rains.

Coordinators

People managing this project

S
Sovoli AdminProject Coordinator
Project details
Status
planned
Category
relief
Priority
Critical priority
Tags
hurricane-recoveryroof-repairschool-facilities
Coordinator notes
Block A is the main administrative block. Complete roof restoration needed urgently.