Restore the roof of Block A, the main administrative block. The roof has been completely stripped off leaving the office, tuck-shop, staffroom and bathroom exposed to the elements. This has resulted in molds, water marks, and water-soaked walls and furniture. Important documents, files, books, furniture and appliances have been destroyed. All electrical systems have been compromised.
APA
Alderton Primary and Infant School
public school•Claremont, St. Ann
Planned
0%
Block A Roof Restoration
Created Nov 28, 2025
What's Needed
Materials
Industrial Roof Sheeting (Square) - 15 sheets
15 of 15 squares remaining
Roof Sealant
1 of 1 item remaining
Roofing Screws w/ Washers - 2.5 in - 9 boxes
9 of 9 boxs remaining
2x2x12 ft Treated Lumber - 10 pieces
10 of 10 boards remaining
2x4x12 ft Framing Lumber - 12 pieces
12 of 12 boards remaining
2x6x12 ft Framing Lumber - 12 pieces
12 of 12 boards remaining
1x6x16 ft Dressed Treated Lumber - 12 pieces
12 of 12 lengths remaining
Plyboard Sheet - 15 sheets
15 of 15 sheets remaining
Heavy-Duty Tarpaulin - 6 pieces
6 of 6 tarps remaining
Part of project group
Alderton Primary and Infant School Hurricane Recovery
Hurricane Melissa recovery project to restore school facilities. Block A (main administrative block) has lost its roof completely, leaving office, tuck-shop, staffroom and bathroom exposed. Block C has also suffered minor damages with parts of the roof compromised. All electrical systems have been compromised, and flooding occurs in corridors when it rains.