Critical priority
GDF

Golaub Dairy Farm

diary farmSt. Elizabeth
Planned
0%

Housing Recovery

Created Dec 3, 2025

The hurricane left the farm family exposed to rain, heat, and pests. The timber-framed residence needs a full strip-down, structural check, and new 26-gauge zinc roof system with hurricane strapping and sealing.

Project Roadmap

0/5 completed

What's Needed

Materials

House Roof – 26-Gauge Zinc Sheets
60 of 60 sheets remaining
House Roof Structural Lumber
3 of 3 bundles remaining
Roof Nails & Fasteners
2 of 2 kits remaining
House Hurricane Straps
80 of 80 packs remaining
House Roof Ridge Cap
6 of 6 lengths remaining
Tar Paper / Underlayment
6 of 6 rolls remaining
Sealant & Flashing Tape
6 of 6 kits remaining
Roof Work Safety PPE
8 of 8 kits remaining

Volunteers

Structural Carpenter
6 of 6 volunteers remaining
Roofing Installers
4 of 4 volunteers remaining
General Labor – Housing Roof
6 of 6 volunteers remaining

Part of project group

Golaub Dairy Farm Recovery

The family-owned small dairy operation suffered major losses during Hurricane Melissa. The storm killed **4 cows, 2 heifers, and 3 calves**, and several trees collapsed onto the boundary fence, blocking access to the **35-acre pasture**. The **cow shed roof** was destroyed, halting all dairy production.

Coordinators

People managing this project

S
Sovoli AdminProject Coordinator
Project details
Status
planned
Category
relief
Priority
Critical priority
Tags
hurricane-recoveryhousingroof
Coordinator notes
Single-family timber structure with galvanized zinc roof. Loss of roof exposes residents to rain and vectors.